1,200-person workforce accommodation camp - for immediate sale

Questions?

We can help:

North America

1.855.331.5797

International

1.855.331.5878

Location and contact information

Located approx. 50 km north east from the Town of Peace River, Alberta
To arrange an inspection or make an offer, contact:
Jim Darrell, Strategic Accounts Manager
Email: jdarrell@ritchiebros.com

  • Constructed by ATCO in 2013
  • Entire facility is WIFI enabled
  • Security system connected to central security office
  • 3 external luggage storage containers
  • Security trailer (office/kitchen/toilet/storage-furnace room/septic tank)
  • Electrified fence line around the perimeter of the workforce accommodation
  • Kitchen (capable of catering to 1,232 people in 1.5 hours)
  • Dining room
  • Lunch bag up room (fridges with rear stocking capacity)
  • Training areas (sliding doors separate into 2 training rooms, full complement of audio visual incl. 80" TVs)
  • 3 offices
  • Medical bay and treatment rooms/offices with shower/toilet
  • Bar/lounge area (incl. 6 TVs)
  • Recreation room (golf simulators, pool tables, table tennis, foosball etc.)
  • Lounge and multi-faith room (board room table, TV and 5 workstations)
  • Commissary
  • Security office and IT server rooms
  • Aerobic suite of equipment
  • Weights suite
  • 2 squash courts
  • Shower/toilet facilities (male and female) and 120 lockers
  • 8 TVs
  • 200M indoor running track
  • All exercise and recreational equipment included
  • West wing: 11 dorms (616 rooms) and flex room
  • East wing: 6 dorms (336 rooms) and flex room
  • South wing: 5 dorms (280 rooms) and flex room
  • Connected by arctic corridors
  • Each dorm – approx. 160 sf each:
    • 56 rooms (28 per floor)
    • Two laundry rooms (3 washers/3 dryers)
    • 2 housekeeping storage rooms
    • Furnace rooms/mechanical rooms
  • Flex rooms in the West, East and South wings (36' x 60'):
    • Lounge
    • Pool table
    • Table tennis
    • Foosball
    • 3 dart boards
    • Poker table
    • 50" TV
    • 3 computer workstations
  • Rooms:
    • All are executive style rooms
    • Equipped with 32" TV, cupboard/drawers/4 hotel style hangers, double bed and desk
    • PTEC unit (gas)
    • Baseboard heater in suite
    • Thermostat in each room
  • Natural gas:
    • Max flow = 77,800 sm³/d
    • Designed for inlet pressure up to 8,500 kPag
    • Inlet inline coaelscer filter
    • Inline electric pre-heater
    • 100% spared step-down electric control valve train (3 valves in series)
    • Slipstream odorizer
    • Potable water:
    • 3 x 50% pumps (VFD controlled)
    • Each pump is rated at 30 m³/hr at 819 kPag
    • Tank volume = 262 m³ working volume
  • Fire water:
    • 2 jockey pumps (5.7 m³/hr @ 896 kPag each – 20 hp motor)
    • 1 electric driven fire pump (227 m³/hr @ 827 kPag – 125 hp motor)
    • 1 back-up diesel engine driven fire pump (227 m³/hr @ 827 kPag – 173 hp engine)
    • Tank volume = 360 m³ working volume

The WWTP is a modular system using membrane bioreactor technology to provide an efficient, compact and reliable plant. WWTP plant can be installed with capacity to treat 375 m³/d average daily flow and includes:

  • Influent fine screen
  • Equalization and aeration tank
  • Ultrafiltration membrane modules
  • Effluent tank
  • UV disinfection
  • Membrane system with UV
  • Capacity of 1,700 people @220 L/person per day
  • 1,100 m³ treated water tank
  • Generating sludge cake
  • Additional process of chlorination added to dispose in the PRC boiler feed system
  • 3 x 15,000 gallon external emergency septic tanks

APEA specs

  • Fine screens
  • Flow equalization
  • Wastewater aeration
  • Membrane bioreactor
  • Ultraviolet disinfection
  • Effluent tank
  • Sludge holding tank
  • Chemical feed station
  • Treated wastewater storage tank (1,100m³)
  • Sludge treatment incl.:
    • Sludge holding tank with coarse diffuser and blowers
    • Sludge de-watering by belt press
  • 4 x diesel @ 01.4 M watt fully synchronized
  • 2 x 100,000 L double walled diesel tanks
  • 2,000 amp-1,200 amp breakers
Note: Buyer's responsibility includes dismantling entirety of workforce accommodation. Buyer assumes full responsibility for load out, any scrapping of workforce accommodation equipment or materials and transportation for scrapping and/or relocation to final destination for the workforce accommodation. Note: pile foundations are not included with the workforce accommodation, however, may be purchased separately.